PLC programming — hydrogen injector assembly line
PLC programming in Siemens TIA Portal and software commissioning of production line stations for hydrogen injector assembly (Bolesławiec plant).
- Siemens TIA Portal
- PLC
- Hydrogen
- Automation
SELECTED PROJECTS · 2014–2026
Automotive and industrial automation experience in the Czech Republic, Germany, and China—from EoL testers and machine vision to PLC and embedded development.
FILTER BY AREA
Showing 59 portfolio entries.
Independent contractor
03 ENTRIES
PLC programming in Siemens TIA Portal and software commissioning of production line stations for hydrogen injector assembly (Bolesławiec plant).
Firmware development for STM32 contactless RFID readers and access control units, including OSDP secure protocol implementation, event logging, and DFU bootloaders.
Development of NI TestStand test sequences and NI LabVIEW test steps for integrating the new RLT Rivian sensor variant into the production line.
Independent contractor
07 ENTRIES
Development and modification of PLC control software for an End-of-Line (EoL) tester of Driver Monitoring System (DMS) cameras (GSRV project and variant 500), including service support.
Development of test and adjustment applications in NI LabVIEW for EoL stations and PLC control programming (helium leak test, pressing) in Siemens TIA Portal.
Development and modification of NI TestStand sequences and NI LabVIEW steps for new RLT sensor variants (Gen62 / R500), including remote line support.
Delivered through PKS servis
PLC programming and modifications for conveyor systems, SECO and ENGICO line expansion, and on-site service support at Model Obaly.
Development of PLC control software for test and production fixtures (JIGs) at the Valeo Wemding plant (Germany).
Firmware development and maintenance across multiple generations of RFID readers and control units (STM32F1/F4) for attendance and access control systems.
Development of the PLC control application for an End-of-Line (EoL) tester of Driver Monitoring System (DMS) cameras at the Valeo Rakovník plant.
Independent contractor
06 ENTRIES
Development of the PLC control application for an Incoming Station handling automated component reel registration for pick-and-place machines at the Valeo Rakovník plant.
Integration of climate-control panel variants into an existing end-of-line tester.
Modifications to production equipment safety functions.
PLC control programming and modifications for an End-of-Line (EoL) tester of motor starters (Load Feeder — LF), including service support at the Siemens Trutnov plant.
MEA
2024 / 05Delivered through PKS servis
PLC control programming and commissioning for conveyor systems at the MEA Plzeň plant.
Development of measurement and testing software in NI LabVIEW for assembly and test stations of hydrogen fuel injectors.
Independent contractor
04 ENTRIES
Welding-cell and safety integration, including flap measurement.
Firmware development and feature extensions for access control units (AR420), attendance terminals (RT320), and NXP CLRC663-based RFID readers.
Service and PLC modifications for an industrial product-marking line.
PLC application programming for a test station.
Independent contractor
05 ENTRIES
Modification of NI TestStand sequences, development of NI LabVIEW measurement steps (reverse current testing), and RLT Gen61 line support.
Siemens PLC programming for a welding fixture.
Siemens PLC programming for a pressing machine.
Modification of an existing industrial inspection camera system.
PLC programming for an industrial pulsation fixture in Beckhoff TwinCAT.
Independent contractor
05 ENTRIES
Firmware development, network services and a web interface for embedded devices.
Development of an application to collect and store production data from injection moulding machines.
Test sequence development and integration of the PQ26 project into the End-of-Line (EoL) control panel tester.
Development of an application for production testing.
Development of a test application and control logic for a laboratory test station, including VTEM terminal configuration.
Independent contractor
06 ENTRIES
Programming the control system for a welding fixture.
Development of a software extension for importing and exporting business system data.
Development of a user interface for a modular radio-frequency signal generator.
Development of STM32 firmware and network services for a UART-to-Ethernet gateway.
Configuration and parametrization of the test application (ELCOM a.s.) in NI LabVIEW for lighting function verification and mechanical headlamp alignment.
Development of a test sequence in NI TestStand and test steps in NI LabVIEW to verify the Gen61 rain sensor in an end-of-line tester.
Independent contractor
07 ENTRIES
Test sequence development and integration of the FORD V362 MCA project into the End-of-Line (EoL) control panel tester.
VALEO INTERIOR CONTROLS
2019 / 02Development of a test framework and CAN communication library.
Development of a test sequence in NI TestStand and test steps in NI LabVIEW for rain sensor inspection.
Configuration and parametrization of the test application (ELCOM a.s.) in NI LabVIEW for lighting function verification and mechanical headlamp alignment.
Development of a test application for a laboratory pedal tester.
VALEO INTERIOR CONTROLS
2019 / 06End-of-line testing of a driver monitoring system.
Configuration and parametrization of the test application (ELCOM a.s.) in NI LabVIEW for lighting function verification and mechanical headlamp alignment.
Independent contractor
07 ENTRIES
Commissioning of the SAVAS noise and vibration measurement system at the customer site.
PLC control, HMI, and PC test sequence for the VALEO X90PHII EoL tester.
Test sequence development and integration of the FORD C519 project into the End-of-Line (EoL) control panel tester.
Development of an application to capture images of transmissions from cameras and support final inspection.
PLC programming and evaluation of the welded nut position.
Configuration and parametrization of the test application (ELCOM a.s.) in NI LabVIEW for lighting function verification and mechanical headlamp alignment.
Development of a PC application for a pipe marking machine, integrated with a PLC and operator interface.
Independent contractor
06 ENTRIES
Commissioning of the SAVAS noise and vibration measurement system at the customer site.
Programming, commissioning and software support for an end-of-line pump tester.
Test sequence development and integration of the FORD C490MCA project into the End-of-Line (EoL) control panel tester.
Configuration and software support for camera inspection.
Test sequence development and integration of the T9 project into the End-of-Line (EoL) control panel tester.
Configuration and parametrization of the test application (ELCOM a.s.) in NI LabVIEW for lighting function verification and mechanical headlamp alignment.
In cooperation with Suzhou Elcom Automation Technology Co., Ltd.
03 ENTRIES
VALEO INTERIOR CONTROLS
2016 / 01Test sequence development and integration of the T9HD project into the End-of-Line (EoL) control panel tester.
PLC control, HMI, and PC test sequence for headlamp EoL testers at the Foshan, Wuhu, and Xiaogan plants.
Assistance with machine acceptance at the customer site.